Saturday, November 17, 2007
A New Roof
Before the new roof was built, the following tasks needed to be accomplished: 4 layers of existing roofs were removed (1 cedar shake and 3 Asphalt shingle layers); 2existing dormers removed; stair tower with new dormer built on the west side; and new dormer built on the east side of the house. 1st and 2nd photos are existing east side with and without dormer. 3rd and 4th photos are the west side from the inside of the 3rd floor.
Subscribe to:
Post Comments (Atom)
1 comment:
Awesome! Everything looks like it's really coming together - just in time for the weather. I love the pool! Looks like it will be big enough for EVERYONE! Great job!
Post a Comment