skip to main | skip to sidebar

Sunday, December 2, 2007

The Basement Floor




Cement was poured over a waterproofing material which was placed on top of a gravel layer and 3 inches of sand. Photo #1 shows the cement from the truck pass through a pump which moves it through a hose into the basement; Photo #2 shows the the white waterproofing material.
Posted by Richard Scalenghe at 8:51 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

LewesAdventure

Blog Archive

  • ►  2010 (7)
    • ►  November (2)
    • ►  June (3)
    • ►  April (2)
  • ►  2009 (19)
    • ►  November (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (5)
    • ►  June (4)
    • ►  April (3)
    • ►  January (1)
  • ►  2008 (41)
    • ►  December (2)
    • ►  November (1)
    • ►  October (4)
    • ►  September (6)
    • ►  July (2)
    • ►  May (7)
    • ►  April (7)
    • ►  February (7)
    • ►  January (5)
  • ▼  2007 (57)
    • ▼  December (12)
      • Covered Walkway
      • More on the New Garage
      • Merry Christmas
      • New Stairs
      • The New Garage
      • Installing the Windows
      • Misc. Photos
      • Framing Out and Installing the New Windows & Doors
      • Misc. Exterior Framing
      • Windows, windows everywhere
      • Mike Panetta visits Lewes!!!!
      • The Basement Floor
    • ►  November (6)
    • ►  October (9)
    • ►  September (5)
    • ►  August (20)
    • ►  July (5)

About Me

Richard Scalenghe
View my complete profile