Friday, June 4, 2010

Staircase






Finally - the stair is done!!!!!...actually, the oak handrails and newel posts still need to be stained & sealed, the balusters need to be painted and the risers and treds given their (at least) 3 coates of finishing....that's all.

Stripping Doors




Richard is in the process of stripping all the doors on the 2nd floor...only to be primed and painted again. Will anyone realize how much elbow grease went into these doors???

Building Permit


We finally passed the building inspection and were able to close out our building permit. Tom applies the "Inspected" sticker to the inside of the electrical box (as required by law and regulation)....and Tom always does things "by the book"!

Thursday, April 1, 2010

Spring Time!





Here are some photos of our Spring flowers.

Staircase






Sorry Everyone...time just got away. Here are some photos of the staircase...original framing, installation of the old chestnut wood for the treads and risers, antique newel post originally from Pittsburgh...we bought it online from an antique store in Maine, balusters being primed, railings getting sanded. Whew! all of this just to get from one floor to another!!!

Monday, November 16, 2009

Front Door





The front door is completed except for painting....before and after photos for your enjoyment!

Monday, October 26, 2009

Stairtower





We kept the door in the stairwell so that we could bring in construction materials without going through the house. Although we still have painting, floor finishing, 2bathrooms to install, we're done with major construction on the 2nd and 3rd floors. So, time for replacing the door with a window. Now comes painting and installing the outside sheathing/trim and insulation, drywall, trim and painting on the inside. Once done, this completes the last installation of the windows and doors!!!!